phronesis / locus / data-room

data room

One place for diligence — thesis, proof, parts, budgets, machine maps.

Product family · concept motion

Locus under phronesis solar: grow your own energy + resonance harvester systems. This page is the investor / partner index — not a substitute for the full pages, a map through them.

Contact: [email protected] — subject “Locus data room”. Materials-only and pilot totals are order-of-magnitude, not quotes.

hybrid pilot →citizen kit →runs →products →pilot budget →

snapshot

Schemes

Grow-your-own · Resonance harvesters

Kit materials mid

~$229

Corpus runs

4 schema-valid (instrument_sim)

P0 example

MPPT +19.6% energy vs fixed

RP0 example

harvest tracks drive_on at f₀

Campus hybrid package

mid ~$5920

thesis

Hubtwo schemes, how-it-works, start pathPowered by laserbrainenergy + recursion harnesslaserbrain productsmart recursion harnessWorldsEarth · Moon · Mars envelopesProductsinvestor write-ups P0–P3 + RP0Hybrid pilotcampus storyboard · three ledgersPortfolio mockstate sum of site ledgersSKUsEarth + sealed/PBR/deck packagesPossible pathsopen expansion map

proof

Runs corpusschema-valid lab-logsCitizen kitBOM + assembleFirmware recipeJSONL logger shapeAlgae dischargedry harvest · food · holdLOI templatesmunicipal grow · parks RP0Measurechannels + schemaBuildP0–P3 + RP0 runbooks

money & parts

Costsmaterials mid + assemblySourcingopen catalogsKit BOM JSONmachine BOMKit BOM CSVspreadsheet cartPilot budgetpackages + site addersmaterials-mid.jsonprose assertion source

machine

protocol.jsonecosystem indexlab-log.schema.jsonrun schemasourcing.jsonsource channelsskus.jsondesign packagesworlds.jsonmulti-world envelopehybrid.jsonhybrid pilot mapportfolio.jsonmock portfolioruns/index.jsoncorpus index

instruments

Grow instrumentenergy oscillatorHarvester instrumentmembrane + piezo modelVegan colonysoft sim on locus energySolar venturephronesis solar

pilot budget · mid USD

Materials mid from locus costs + kit. Labor mid studio $75/hr order of magnitude. Excludes permits, UL/CE, install wages, site work. Not a quote.

line items

linematerialslabortotal
Citizen grow kit (P0 materials)$229$300$529
Shared instruments (once)$250$75$325
P3 roof unit materials (mid)$450$1050$1500
RP0 lab pad materials (mid)$420$675$1095
RP0 plaza pad materials (mid)$2800$2400$5200

packages

A · Proof stack (first measured path)

Citizen kit + instruments — ship a P0 pass into /locus/runs

materials $479 · labor $375 · total $854

B · Campus hybrid pilot (3×P3 + RP0 lab)

Three grow roof units + one resonance lab pad + shared instruments

materials $2020 · labor $3900 · total $5920

Add racking, permit, install, safety cert on top of materials+bench labor

C · Public plaza harvester + one P3

One grow unit + one plaza-scale RP0 node

materials $3500 · labor $3525 · total $7025

Public install and safety envelope dominate beyond materials

Machine: /locus/pilot-budget.json

site adders (on top of bench)

Order-of-magnitude adders on top of materials+bench labor. Jurisdiction and scale dominate.

adderlowmidhigh
Simple permit / inspection band$200$800$2500
Roof racking / ballast materials+labor band (per P3-class)$150$600$2000
Install crew day (2–3 people)$800$1600$3200
Interconnection / electrical consult$300$1200$5000
Public-safety review / soft cert path (RP0 plaza+)$1000$5000$25000
UL/CE style path (when commercializing SKU)$5000$20000$80000

Example campus hybrid all-in mid ≈ $11,320 (bench $5920 + site stack)

corpus status

Corpus of schema-valid runs including Earth benches and Moon/Mars analogs (instrument_sim). Hardware provenance replaces sim as benches and analogs ship.

  • P0 · pass · instrument_sim · JSON
  • RP0 · pass · instrument_sim · JSON
  • P3 · pass · instrument_sim · JSON
  • P0 · pass · instrument_sim · JSON

contact

Building a pilot, requesting a walkthrough, or opening diligence:

email data room